Trạm xử lý nước thải KCN Hòa Phú | Ecoba ENT

Hoa Phu Industrial Zone WasteWater Treatment Plant


Project detail

Hiep Hoa, Bac Giang
Phu My Group JSC.,
Phu My Group JSC.,
7/2019 - 12/2019
2.000 m3/day
Physico-chemical with AO
Class A-QCVN 40: 2011/BTNMT
• Technology Design • Construction • Equipment supply, installation, testing, operation • Training, technology transfer, discharge permit



Related news